The World’s Leading Information Resource For Maintenance & Engineering Professionals.

Social Media

13 Floor Boiler Building Lift

MHI Case Studies >> 
Milwaukee, Wisconsin (October 25, 2010) - A Pflow vertical reciprocating conveyor (VRC) was recently installed at a 13 story boiler building at a manufacturing facility in Oklahoma. The VRC replaces a 10 ton hoist mounted at the top floor of the building providing a safer lifting alternative, and easier loading and unloading at each floor.

For more solutions please try www.hazeng.com or www.engineeringtrader.com