State-of-the-art distribution center is a tribute to engineering and new technologies in warehousing

MHIA.org Case Studies >> 
Retrotech Inc. was commissioned by a Fortune 50 consumer goods manufacturer to develop one of the world’s largest automated distribution centers using state-of-the-art technology. Retrotech employed a unique super high-density dynamic storage technology ...

Read more: State-of-the-art distribution center is a tribute to engineering and new technologies in warehousing

Complete, Clean Solution for Food Processing

MHIA.org Case Studies >> 
A manufacturer of processed cheese products was struggling with productivity on a production line that feeds 640 pound blocks of bulk Mozzarella and Cheddar cheese into a shredding machine. Ingersoll Rand developed a system that included an all-aluminum ...

Read more: Complete, Clean Solution for Food Processing

Flexible Pick to Light System Supports Growth of Major Supplier of Fragrances and Beauty Products

MHIA.org Case Studies >> 
In 2001, a major supplier of fragrances and beauty products was acquired. Not only did the merger bring together several disparate distribution systems, but the company was expecting serious growth within the next few years. Three distribution centers ...

Read more: Flexible Pick to Light System Supports Growth of Major Supplier of Fragrances and Beauty Products

Book & Multimedia Retailer Uses Vertical Carousels to Consolidate Store Orders

MHIA.org Case Studies >> 
A global book and multimedia retailer was looking for a way to increase efficiencies and make better use of floor space in its distribution centers. A new store order consolidation system was developed, which includes two dozen vertical carousels. The ...

Read more: Book & Multimedia Retailer Uses Vertical Carousels to Consolidate Store Orders

C-17 Productivity Takes Off With Work-in-Process System

MHIA.org Case Studies >> 
When the worlds leading aircraft manufacturer won a contract to build the USAFs newest transport aircraft, they needed to lower production costs, meet fast approaching deadlines and attain a 15% internal rate of return on investment within 5 years. To ...

Read more: C-17 Productivity Takes Off With Work-in-Process System

Konecranes Biomass Crane Helps Whistler Resort Manage Waste, Reduce Carbon Footprint

MHIA.org Case Studies >> 
When a municipal waste composting facility outside Vancouver shut down because of odor problems, a new facility was sited in the Resort Municipality of Whistler. The process transforms a mixture of sewage solids, food waste and waste wood into high-quality ...

Read more: Konecranes Biomass Crane Helps Whistler Resort Manage Waste, Reduce Carbon Footprint

Streamlined Work-in-Process System, Powerful Software Maximize Uptime

MHIA.org Case Studies >> 
Struggling with excessive maintenance problems and unacceptable upkeep costs related to its outmoded AS/RS, a major producer of telecommunications products needed a more advance system that required less floor space, but could deliver more product to ...

Read more: Streamlined Work-in-Process System, Powerful Software Maximize Uptime

Konecranes Supplies Four Automated Cranes to First Poultry Litter Fueled Power Plant in United States

MHIA.org Case Studies >> 
A year-round stream of poultry litter generated by Benson, Minnesota turkey raising operations totaling 700,000 tons each year combined with the tradition of spreading litter on agricultural fields as fertilized had begun to impact water quality in central ...

Read more: Konecranes Supplies Four Automated Cranes to First Poultry Litter Fueled Power Plant in United...

Manufacturer Realizes Same-Day Turnaround on Orders

MHIA.org Case Studies >> 
In order to improve customer response time for this manufacturer of various access hardware solutions (locks, fasteners, latches and hinges), an integrated material handling system was designed for the order fulfillment center. Learn how the final system ...

Read more: Manufacturer Realizes Same-Day Turnaround on Orders

Konecranes PD Cranes and Turnkey Steel Runway Selected by Innovative Precast Concrete Manufacturer

MHIA.org Case Studies >> 
One of the largest precast concrete companies in the U.S., Tindall Corporation purchased an existing plant in San Antonio, TX. The company wanted maximum lifting flexibility to accommodate future products. Because the states were high and time short, ...

Read more: Konecranes PD Cranes and Turnkey Steel Runway Selected by Innovative Precast Concrete Manufacturer

Increased Efficiency is Just What the Doctor Ordered

MHIA.org Case Studies >> 
A distributor of medical and health-related supplies utilized pallet rack and a stationary shelving system for storage; they needed a new system to increase productivity and decrease labor costs. An order processing system was designed and integrated, ...

Read more: Increased Efficiency is Just What the Doctor Ordered